NovaConsilium
Practice 04 · Make it right, first time

Quality, Product Assurance & Industrialization

From a mature design to a qualified, repeatable production process.

For programs crossing the gap from development to serial production. We bring industrialization into the design phase — producibility, manufacturability and measurability — wire APQP/AS9145 into the program plan, control configuration from design, make gates enforceable and build preventive process assurance on the shop floor.

Questions we answer
  • Is the design mature — and producible, manufacturable and measurable at rate?
  • Is our configuration under control from design through to the field?
  • Can our gates actually stop a program that is not ready?

Services

4.1

Design for Producibility, Manufacturability & Measurability

Industrialization starts in design: producible, manufacturable and measurable before the design is frozen.

4.2

APQP / AS9145 Field Deployment

APQP wired to program gates and applied hands-on until PPAP and FAI are achieved.

4.3

Configuration Management (EIA-649) & PLM

Independent CM from design: baselines, CCB and status accounting run in your PLM.

4.4

Design Maturity & Gate Governance

Product ownership, maturity criteria and gates that can stop a program.

4.5

Manufacturing & Process Quality

Preventive process assurance and closed-loop nonconformance control — quality built in.

Outcomes
  • Producible, measurable designs
  • Frozen, controlled data packages
  • Gates that can stop a program
  • Less rework, fewer escapes
Standards & frameworks
AS9145AS9102AS9103EIA-649MRLDfM/DfAAS9136